Tag Archives: incinerator

Now you can move your incinerator by truck to anywhere! Containerized waste incinerator is our latest design for market. This incinerator is build in ISO container before leave factory. After customer received container, install the chimney and connect with electric power and setup oil tank, that’s all. Now, the burning capacity can be 30 kgs/50kgs/100kgs per hour for ISO 20’feet container. This moveable/mobile incinerator can be move by truck to any site by local customer. This kind of incinerator is good choice for different end-customer site, Service personnel can move to there and service at local site. It is also best service type for family pet cremation service and other emergency status.  

low-cost medical waste incinerator is good idea for small clinic, small hospital, etc.Incineration is the only method providing complete destruction and neutralization of the medical waste ideally at the source. For developing country and regions, we support cheap cost budget customer to purchase the small scale incinerator, with basic function, burning rate 10kgs to 50kgs per hour capacity, single combustion chamber and three combustion chambers incinerator. Items/Model YD-10C YD-20C YD-30C YD-50C Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr. Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs Equipment Weight 2100 kgs 2100 kgs 2300 kgs 2500 kgs Primary Chamber (Liters) 200 200 250 400 Secondary Chamber (Liters) 140 140 140 140 External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200 Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85 Oil Tank(Liters) 50 100 100 150 Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55…

Read more

Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope.Ash Removal It should be auto ash removal system.Fuel It should be dual system, such as diesel and natural gas.Feeding System Should be auto feeding system into primary chamber.Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C.Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C.Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or equivalent.Noise Level Not more than 85 dBA during normal operation.Inaddition The desigh should insure that responsive fail-safe control systems are used. The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning&nbsp ;system for trucks and waste containers, and cool storage area…etc. The quotation should included list of original spare parts for 7 years. The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside Kuwait. Detailed drawings, catalogs should be included.

HICLOVER brand is holder of Nanjing Clover Medical Technology Co.,Ltd. we are incinerator manufacturer in china and we made waste incinerator for medical waste, pet cremation, animal incineration and other solid waste treatment. HICLOVER is famous incinerator manufacturer all over the world and our incinerators sale to many countries. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity 20kg 40kg 60kg 100kg 200 kg Control Mode PLC PLC PLC PLC PLC Combustion Chamber 100L 210L 330L 560L 1200L Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm Secondary Chamber 50L 110L 180L 280L 600L Smoke Filter Chamber Yes Yes Yes Yes Yes Feed Mode Manual Manual Manual Manual Manual Voltage 220V 220V 220V 220V 220V Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28 Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2 Temperature Monitor Yes Yes…

Read more

incinerator china, call hiclover brand(www.hiclover.com).  Nanjing Clover Medical Technology Co.,Ltd. is top incinerator supplier in china and supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity 20kg 40kg 60kg 100kg 200 kg Control Mode PLC PLC PLC PLC PLC Combustion Chamber 100L 210L 330L 560L 1200L Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm Secondary Chamber 50L 110L 180L 280L 600L Smoke Filter Chamber Yes Yes Yes Yes Yes Feed Mode Manual Manual Manual Manual Manual Voltage 220V 220V 220V 220V 220V Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28 Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2 Temperature Monitor Yes Yes Yes Yes Yes Temperature Protection Yes Yes Yes Yes Yes Oil Tank 100L 100L 100L 100L 200L…

Read more

New medical waste incinerator for Afghanistan and Macau in October,2014

Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope.Ash Removal It should be auto ash removal system.Fuel It should be dual system, such as diesel and natural gas.Feeding System Should be auto feeding system into primary chamber.Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C.Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C.Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or equivalent.Noise Level Not more than 85 dBA during normal operation.Inaddition The desigh should insure that responsive fail-safe control systems are used. The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning&nbsp ;system for trucks and waste containers, and cool storage area…etc. The quotation should included list of original spare parts for 7 years. The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside Kuwait. Detailed drawings, catalogs should be included.

Six Sets Medical Waste Incinerator with 30kgs per hour capacity for Pakistan this week.  

78/78