laboratory incinerator
Incineration is the most environmentally acceptable method of laboratory waste disposal. Combustion of organic materials with excess oxygen at high temperatures for sufficient time results in degradation to elemental constituents or by-products that are easier to handle in an environmentally acceptable manner. In addition to heat, the principle products of incineration are carbon dioxide, water, and oxides of sulfur and nitrogen; depending on what is burned, other volatile materials may also be formed. Nonvolatile products include fly ash and solid residues. Safe laboratory waste destruction is an ongoing challenge. With such a wide range of pollutants and particulates it is essential laboratory incinerators reach high temperatures to ensure total destruction of hazardous waste streams.Due to the secondary chamber with its 2 second retention period, the laboratory incinerator range is well suited to process all types of clinical & pathological waste such as: Solids (powder, pastes, pills, resins, sludge’s),Packaged wastes…
Required Specifications for Mobile Incinerator
Operational Capabilities PROCESS MINIMUM 1 TON PER DAY OPERATED WITH LIMITED TRAINING REGULAR MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS ABILITY TO BURN WASTE LUBRICANTS (POL) HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) DEPLOYABLE MOBILE 24 HRS OF CONTINUOUS USE AUTOMATIC LOADING SYSTEM AUTOMATED ASH REMOVAL SYSTEM GAS SCRUBBING SYSTEM 95% REDUCTION OF SOLID WASTE OPERATE OFF DIESEL OR FUEL OIL CAPABLE OF BURNING 4 UNITS OF WASTE PER UNIT OF FUEL ABLE TO TAKE ALL COMBUSTIBLE WASTE TO INCLUDE: PAPER, PLASTIC, CARDBOARD, FOOD, USED OILS, SLUDGE, OILY RAGS, WOOD NO PRE-TREATMENT OF WASTE REQUIRED FIVE (5) YEAR COMPONENT WARRANTY Technical Specifications OPERATION MANUAL AND TRAINING MANUAL FOR EACH INCINERATOR SET UP AND INSTALLATION INSTRUCTION MANUALS BLUE PRINT/ SCHEMATIC PROVIDED THAT OUTLINES THE PHYSICAL DIMENSIONS OF THE 20’ INCINERATORS INCINERATORS COMPOSED WITH HEAVY DUTY WELDED CONSTRUCTION OPERATED AND TRANSPORTED…